The
Community Council, through its effort for a qualitative
upgrade of the way of living in the community, has proceeded
with the creation of various infrastructure and beautification
projects.

- The multi-purpose cultural centre, which includes a
cafeteria, the Community Council's offices, a playground,
and an amphitheatre, has already been completed and
it operates.
- The entire water supply system has been replaced.
- The community library has been completed and is operating
for some time now.

- A new cemetery has been constructed outside the village.
- All the streets of the community have been covered with
blacktop.

- The naming and numbering of all the streets and houses
of the community has been done.
- Garbage collection takes place twice a week.
- The per house distribution of mail is done daily.

- A new, built fountain with running water from the wellhead,
benches, and trees has been created in the centre of
the community.
- The planting of 250 trees around the water-dam, as well
as the main street that connects the village with Germasogeia,
has been done.
|