The Community Council, through its effort for a qualitative upgrade of the way of living in the community, has proceeded with the creation of various infrastructure and beautification projects.

  • The multi-purpose cultural centre, which includes a cafeteria, the Community Council's offices, a playground, and an amphitheatre, has already been completed and it operates.
  • The entire water supply system has been replaced.
  • The community library has been completed and is operating for some time now.

  • A new cemetery has been constructed outside the village.
  • All the streets of the community have been covered with blacktop.

  • The naming and numbering of all the streets and houses of the community has been done.
  • Garbage collection takes place twice a week.
  • The per house distribution of mail is done daily.

  • A new, built fountain with running water from the wellhead, benches, and trees has been created in the centre of the community.
  • The planting of 250 trees around the water-dam, as well as the main street that connects the village with Germasogeia, has been done.
 
 
 